Closed for construction


A wastewater pump station is under construction at NW 68th Street in Newport, making that stretch of road inaccessible to all traffic except for local residents, according to a media release from the city of Newport. Beach access from 68th Street is also closed during the construction. For further information, call the city’s public works director and city engineer, Tim Gross, at 541-574-3366. (Photo by Madeline Shannon)

Advertisement

More In Local News